Stap 12 vertalen
Stap 12
Shield Termination
-
Crimp ring terminal to shield braid
-
Install ring terminal to designated grounding location. Often the connector back-shell.
-
This step is done last after all wires for a connector are installed and back-shell is assembled on connector. Sometimes a separate ground lug needs to be installed onto the back-shell.
Je bijdragen zijn gelicentieerd onder de open source Creative Commons-licentie.