Wijzigingen aan stap #3
Stap regels
[title] Verify polarity and tape the leads onto the new cell | |
- | [* icon_caution] ***''ONLY USE ENOUGH TAPE FOR A FIRM HOLD. Using too much may lead to a shorted cell!''*** |
- | [* icon_caution] ***''BEFORE INSTALLING LEADS ON THE CELL, TEST THE CELL WITH A MULTIMETER TO CONFIRM THE POLARITY!''*** |
+ | [* icon_caution] ***''ONLY USE ENOUGH TAPE FOR A FIRM HOLD. Using too much may short out the cell!''*** ***''In addition to using as little tape as possible, the cell must be tested before installation with a multimeter!''*** |
[* black] After the polarity has been matched, tape the positive lead to the new cell. ***''To remove the risk of a failed rebuild, start on the + side and cut the tape to fit comfortably.''*** |