Ga door naar hoofdinhoud

Deze handleiding heeft recentere wijzigingen. Schakel over naar de nieuwste niet-geverifieerde versie.

MacBook Air 11" Mid 2013 I/O Board Cable Replacement

Wat je nodig hebt

  1. MacBook Air 11" Mid 2013 I/O Board Cable Replacement, Lower Case: stap 1, afbeelding 1 van 1
    Gereedschap gebruikt in deze stap:
    P5 Pentalobe Screwdriver Retina MacBook Pro and Air
    $5.99
    Koop
    • Shut down and close your computer. Lay it on a soft surface top-side down.

    • Remove the following ten screws:

    • Two 8 mm 5-point Pentalobe screws

    • Eight 2.5 mm 5-point Pentalobe screws

    • The special screwdriver needed to remove the 5-point Pentalobe screws can be found here.

  2. MacBook Air 11" Mid 2013 I/O Board Cable Replacement: stap 2, afbeelding 1 van 1
    • Wedge your fingers between the display and the lower case and pull upward to pop the lower case off the Air.

  3. MacBook Air 11" Mid 2013 I/O Board Cable Replacement, Battery Connector: stap 3, afbeelding 1 van 2 MacBook Air 11" Mid 2013 I/O Board Cable Replacement, Battery Connector: stap 3, afbeelding 2 van 2
    • In this step you will disconnect the battery to help avoid shorting out any components during service.

    • Use the flat end of a spudger to pry both short sides of the battery connector upward to disconnect it from its socket on the logic board.

    • Bend the battery cable slightly away from the logic board so the connector will not accidentally bend back and make contact with its socket.

  4. MacBook Air 11" Mid 2013 I/O Board Cable Replacement, I/O Board Cable: stap 4, afbeelding 1 van 2 MacBook Air 11" Mid 2013 I/O Board Cable Replacement, I/O Board Cable: stap 4, afbeelding 2 van 2
    • Use the flat end of a spudger to pry the left and right I/O board cable connectors up off their respective sockets on the I/O board.

  5. MacBook Air 11" Mid 2013 I/O Board Cable Replacement: stap 5, afbeelding 1 van 1
    • Lift and remove the I/O board cable.

Conclusie

To reassemble your device, follow these instructions in reverse order.

4 andere personen hebben deze handleiding voltooid.

Sam Goldheart

Lid sinds: 10/18/12

465.299 Reputatie

538 handleidingen geschreven

Team

iFixit Lid van iFixit

Staff

136 Leden

16.578 handleidingen geschreven

0 opmerkingen

Voeg opmerking toe

Weergavestatistieken:

Afgelopen 24 uren: 1

Afgelopen 7 dagen: 4

Afgelopen 30 dagen: 12

Altijd: 2,471